Skip to content

330-264-3424 | fbs@freemanbuilding.com

Butler-Logo
Freeman Building Systems Logo
  • ABOUT US
  • SERVICES
  • BLOG
  • PROJECTS
  • BUTLER MFG
  • CONTACT US
Freeman Building Systems Logo
  • ABOUT US
  • SERVICES
  • BLOG
  • PROJECTS
CONTACT US
Freeman Building Systems Logo
  • ABOUT US
  • SERVICES
  • BLOG
  • PROJECTS
  • BUTLER MFG
  • CONTACT US

Company Announcement

Home » Company Announcement
  • Lyric Theater Renovation by Freeman Building Systems in Downtown Wooster

    General Construction / Insights

    The Lyric Theater Opens in Downtown Wooster: A Timeless Treasure Restored

    Read Article
fbs@freemanbuilding.com
330-264-3424
580 Venture Blvd., Wooster, Ohio 44691

freemanbuildingsystems

“This company takes care of its own, and they care “This company takes care of its own, and they care about each other. That’s why I’m still here.”

Cy Conrad has been part of Freeman Building Systems for more than 17 years and now serves as General Superintendent.

He started in an entry-level role and built his career over time through consistency, accountability, and a commitment to the work.

That progression reflects how the team operates—each role contributing to the next, with clear expectations and shared responsibility across every project.

Watch Cy’s story to hear what that experience has meant to him.

@butlermfg

#FreemanBuildingSystems #ButlerManufacturing #DesignBuild #NortheastOhio #BuildingALife
In warehouse and distribution facility constructio In warehouse and distribution facility construction, layout drives efficiency.

Early planning should address:
• Product flow
• Equipment and pedestrian safety
• Future expansion needs

A structural system with clear spans and long-term flexibility supports those decisions from the start. That is why we often build with Butler systems for commercial warehouse projects.

@woosterbrushcompany
@butlermfg

#WarehouseConstruction #DistributionFacility #CommercialConstruction #ButlerBuildings #SteelBuildings
Accountability at Freeman Building Systems is buil Accountability at Freeman Building Systems is built into how projects are executed.

Through EOS®, the Entrepreneurial Operating System, the team operates with a shared structure for priorities, communication, and follow-through across every project.

With multiple projects active at once and teams working across different phases, each step depends on consistent execution. Clear expectations and defined responsibilities help maintain progress from one phase to the next.

Watch Jarad Roberts, Director of Internal Operations, explain how accountability is applied across the organization.

@butlermfg

#FreemanBuildingSystems #ButlerManufacturing #DesignBuild #NortheastOhio #CommercialConstruction

#FreemanBuildingSystems #ButlerManufacturing #DesignBuild #NortheastOhio #CommercialConstruction
Follow on Instagram
Freeman Building Systems Logo
  • About Us
  • Services
  • Projects
  • Blog
  • Join Our Team
  • Butler MFG

© 2026 • Freeman Building Systems •

Privacy Statement  |  Terms of Use

fbs@freemanbuilding.com

330-264-3424 (Wooster)
419-524-3600 (Mansfield)
Fax : 330-263-6611

580 Venture Blvd.
Wooster, Ohio 44691

freemanbuildingsystems

“This company takes care of its own, and they care “This company takes care of its own, and they care about each other. That’s why I’m still here.”

Cy Conrad has been part of Freeman Building Systems for more than 17 years and now serves as General Superintendent.

He started in an entry-level role and built his career over time through consistency, accountability, and a commitment to the work.

That progression reflects how the team operates—each role contributing to the next, with clear expectations and shared responsibility across every project.

Watch Cy’s story to hear what that experience has meant to him.

@butlermfg

#FreemanBuildingSystems #ButlerManufacturing #DesignBuild #NortheastOhio #BuildingALife
In warehouse and distribution facility constructio In warehouse and distribution facility construction, layout drives efficiency.

Early planning should address:
• Product flow
• Equipment and pedestrian safety
• Future expansion needs

A structural system with clear spans and long-term flexibility supports those decisions from the start. That is why we often build with Butler systems for commercial warehouse projects.

@woosterbrushcompany
@butlermfg

#WarehouseConstruction #DistributionFacility #CommercialConstruction #ButlerBuildings #SteelBuildings
Accountability at Freeman Building Systems is buil Accountability at Freeman Building Systems is built into how projects are executed.

Through EOS®, the Entrepreneurial Operating System, the team operates with a shared structure for priorities, communication, and follow-through across every project.

With multiple projects active at once and teams working across different phases, each step depends on consistent execution. Clear expectations and defined responsibilities help maintain progress from one phase to the next.

Watch Jarad Roberts, Director of Internal Operations, explain how accountability is applied across the organization.

@butlermfg

#FreemanBuildingSystems #ButlerManufacturing #DesignBuild #NortheastOhio #CommercialConstruction

#FreemanBuildingSystems #ButlerManufacturing #DesignBuild #NortheastOhio #CommercialConstruction
Follow on Instagram
Freeman Building Systems Logo
  • About Us
  • Services
  • Projects
  • Blog
  • Join Our Team
  • Butler MFG

© 2026 • Freeman Building Systems •

Privacy Statement  |  Terms of Use

Toggle Sliding Bar Area
Page load link
  • ABOUT US
  • SERVICES
  • BLOG
  • PROJECTS
  • BUTLER MFG
  • CONTACT US
Go to Top